A preparation of up to 9.8 MW hydropower plant in Svartá. Verkís worked on the environmental impact assessment.
A plan of building a 9.8 megawatt hydropower plant. An environmental impact along with preliminary design and a feasibility study.
Verkís manages the project design of the catching dam and the levee, as well as the preparation of the tender documents.
The avalanche defenses is based on the construction of a 300-meter-long levee to receive avalanches from the ravine and direct them into the sea.
By filling in drainage ditches, wetlands that were previously disturbed can be reclaimed and the area can be developed as a nature reserve.
A land-use plan for Álftanes. Verkís carried out an environmental assessment, the planning of utilities, traffic planning and design.
Verkís conducted an environmental analysis and prepared a plan for the disposal of hazardous materials due to the demolition of ten apartment buildings.
An area, which will be planned with natural quality, sustainability and shared use as a guiding principle.