Bouillante 1&2 geothermal power plant

Verkís has been engaged in various assignments for Geóthermie Bouillante from feasibility study and conceptual design for development of the plant.



Project overview

Linked among others to reinjection, to inspection and expertise services on plant condition, operation and maintenance.
The Geothermal Power Plant in Guadeloupe, Carribean, is a 15 MW plant producing electricity with two turbo-generator sets powered by saturated steam from geothermal wells. The first generator 1,5 MW, went online in 1996 and the second 10 MW, in 2004. The plant contributed to almost 5% of the island‘s electricity supplies in 2011. The plant is operated by Géothermie Bouillante which is 97.8% owned by the French Geological Survey BRGM and 2.2% by EDF.
15mw

Installed Capacity



5%

Of Island Electricity Supply



2

Turbo-Generator Units

The Challenge

The Bouillante Geothermal Power Plant is one of the Caribbean’s most important renewable energy facilities, supplying geothermal electricity to Guadeloupe. The challenge was to support the long-term development, operation and reliability of the plant through technical expertise, resource optimization and infrastructure improvements.

Our Solution

Verkís has provided engineering consultancy for the Bouillante Power Plant across multiple project phases, from feasibility studies and conceptual design to technical inspections and operational support. Our services have included expertise in geothermal reinjection, plant condition assessments, operation and maintenance strategies, helping optimize plant performance and support future development.

The Result

Verkís has contributed to the continued development and reliable operation of the Bouillante Geothermal Power Plant, helping maximize the value of one of Guadeloupe’s key renewable energy resources. Through specialist geothermal expertise and long-term technical support, the project strengthens sustainable electricity generation and supports the island’s transition towards a cleaner energy future.


Technical information

Location:


Bouillante, Carribean


Size:


15 megawatts


Project period:


2009 – 2015




Services Provided




World goals