Verkís manages the project design of the catching dam and the levee, as well as the preparation of the tender documents.
The avalanche defenses is based on the construction of a 300-meter-long levee to receive avalanches from the ravine and direct them into the sea.
Three rows of cones will be built above the existing levees in order to reduce the flood speed in both the stauchwall and the dense core.
The construction of treatment plants along with the laying of a drainage system in Akranes, Borgarnes, and Kjalarnes.
The station replaces an older pumping station, the project consists of the preparation of three construction tenders and four material tenders.
Dýrafjörður tunnel is a new tunnel and adjoining roads between Arnarfjörður og Dýrafjörður at Western fjords in Iceland.
A tunnel that was constructed under Vaðlaheiði by Eyjafjörður. The tunnel shortens the distance between Akureyri and Húsavík by 15.7 km.
Shore power systems enable ships to connect to the local electricity grid, reducing fuel consumption, emissions, and noise while in harbour.
Shore power systems enable vessels to connect to the local electricity grid, reducing fuel consumption, emissions, and noise in harbour areas.